Case Studies From ConEdison Solutions

Quick Links: Select Category Link Below
K-12 Schools »Federal Facilities »Correctional Facilities »Colleges & Universities » State and Local Municipalities » Museums »  
Bluestem Unified School

K-12 Schools

Bluestem Unified School, KS
Several unique obstacles arose during the course of the project with Bluestem Unified School District 205. One of the elementary schools evaluated, though only eight years old, had never had a properly functioning mechanical and controls system. More »

The Pennsylvania State University - Pennsylvania

Colleges & Universities

The Pennsylvania State University - Pennsylvania Pennsylvania State University wanted to reduce both its energy consumption and its impact on the environment. In 2002, The University began the Guaranteed Energy Savings Program to reduce the university's energy use and carbon footprint at its many campuses and colleges around the Commonwealth. More »

 

Contact 1-888-210-8899

Northeast Anthony Spera speraa@conedsolutions.com
Southeast Michael Gibson
gibsonm@conedsolutions.com
Midwest Tim Unruh
unruht@conedsolutions.com

Corporate Bob Lesch leschr@conedsolutions.com

Energy Efficiency Upgrades

Large businessess, universities and government facilities can upgrade energy systems without capital expenditures

ConEdison Solutions
Buhler Unified School Buhler Unified School.KS
Buhler Unified School District is located in central Kansas, and consists of nine buildings with an enrollment of 2,200 students. Six schools and the Burkholder Administrative Center were identified as needing repairs and upgrades. More »
The Pennsylvania State University, Penn State Beaver - Monaca, PA The Pennsylvania State University, Penn State Beaver - Monaca, PA
Penn State Beaver faced maintenance problems and comfort issues resulting from an aging infrastructure. The most serious of these issues was the failed heating system in the Michael Baker Building, one of the main teaching facilities on the campus. More »

Columbia Public Schools

Columbia Public Schools, MO
The Columbia Public School District is comprised of 30 school buildings. Many of these schools are older facilities that were constructedwithout central air conditioning. The district wanted to hold summer school for elementaryschool students and needed a way to keep the students cool during the hottest days of the year . More »

- back to top -

The Pennslyvania State University, Penn State Erie, - The Behrend College

The Pennslyvania State University, Penn State Erie
The Behrend College Erie, PA One of the most notable and visible changes was the installation of a 1.8 kW wind turbine. The wind turbine not only supplies renewable energy to the campus, but serves as an education and research tool for studying wind power. More »

- back to top -

Foster-Glocester School District, RI Foster-Glocester School District, RI
A $46 million project to both build a new middle school and renovate their high school. The project’s building committee created an energy committee to work on how to heat the schools. More »
The Pennslyvania State University,Penn State Harrisburg - Harrisburg, PA The Pennslyvania State University,Penn State Harrisburg - Harrisburg, PA
Weatherization upgrades were made to windows and doors, and a variety of other green enhancements were implemented across the campus as part of an energy-efficiency project, helping the university with its commitment to go green. More »
Harrisonville Cass R-IX School District Harrisonville Cass R-IX School District, KS
Harrisonville Cass R-IX School District is located in Harrisonville, Missouri, near the Kansas City metropolitan area. The district needed more facility space because of a projected increase in enrollment. The district also had maintenance problems as a result of failing equipment
and aging facilities.. More »
The Pennslyvania State University, West Halls Residential Complex - Park, PA

The Pennslyvania State University, West Halls ConEdison Solutions, through its subsidiary, Custom Energy Services, performed a detailed audit to examine how the buildings were using energy and proposed a comprehensive set of energy saving measures to be implemented . More »

 

Missouri school districts are facing major financial challenges

Missouri School Districts, MO
With little or no up-front cost, under an EPC, an energy services company (ESCO) guarantees the savings that will be generated by energy-efficient improvements. These pledged savings enable districts to redirect portions of their utility operating budgets into infrastructure improvements.   An Energy Strategy That Helps Tackle Deferred Maintenance Challenges »;

- back to top -

Alexandria Sanitation Authority (ASA), VA

State and Local Municipalities

Alexandria Sanitation Authority (ASA), VA
The Alexandria Sanitation Authority’s (ASA) main wastewater treatment facility is a 54 million gallon/day, high tech, wastewater treatment plant. The Authority had recently completed a $250 million plant upgrade and was looking for additional energy cost saving measures. More »

- back to top -

Windham Public Schools - Willimantic and Windham, CTEnergy. Windham Public Schools - Willimantic and Windham, CT
The Windham Public School District wanted to make district-wide energy efficient upgrades to improve the learning environments throughout its facilities. The district is located in Eastern Connecticut and consists of six (6) separate facilities: More »
Arlington County, VA Arlington County, VA
The Arlington Initiative to Reduce Emissions (AIRE) has set a goal of reducing the county’s emissions by 10% from 2000 to 2012. AIRE is looking to reduce the county’s impact on the environment while it encourages county citizens and businesses to do the same. More »
GSA and Consolidated Edison’s Strong Partnership Has Many Rewards

Federal Facilities

UESC Success Story: GSA and Consolidated Edison’s Strong Partnership Has Many Rewards GSA has pursued its energy goals by partnering with Con Edison. The utility provides a wide array of programs and services to property management and regional office teams, including comprehensive energy audits, demand response programs, rebates, energy awareness efforts, and advanced meters. More »

Baltimore City Fire Stations - Baltimore, MD Baltimore City Fire Stations - Baltimore, MD
The City of Baltimore asked ConEdison Solutions, through its subsidiary, Custom Energy Services, to investigate opportunities for energy efficiency in its seven largest fire department facilities. Several of the firehouses had heating systems that failed frequently and were beyond repair. More »
Department of Justice - Dallas, TX

Department of Justice - Dallas, TX
The biggest challenge ConEdison Solutions faced, through its subsidiary Custom Energy Services, was keeping a computer room used to monitor critical nation-wide operations on a 24/7 basis, consistently cool. Also, this is a historic building and all work needed to take that factor into consideration. More »

- back to top -

City of Charlottesville, VA

City of Charlottesville, VA
The City of Charlottesville’s utility costs increased 35% in a single year. With the rising cost of energy, the city faced a potentially significant impact on budgets now and into the future. More »

- back to top -

Internal Revenue Services Farmers Branch, - TX Internal Revenue Services - Farmers Branch, TX
The GSA/IRS facility in Farmers Branch, TX received the ENERGY STAR®, scoring 98 out of 100. This placed it in the top five percent of energy efficient office buildings in the United States. More »
J.F. Kennedy Presidential Library & Museum, MA J.F. Kennedy Presidential Library & Museum, MA
The National Archives and Records Administration (NARA) is responsible for preserving all records of historical significance pertaining to the United States government and overseeing all presidential libraries. More »
   
U.S. Coast Guard Integrated Strategic Command - Boston, MA U.S. Coast Guard Integrated Strategic Command - Boston, MA
ConEdison Solutions helped the Coast Guard achieve more energy-efficient heating and cooling of the buildings. The water-cooled centrifugal chillers installed to replace the DX cooling units help to reduce cooling costs by approximately 75%. More »
El Dorado Correctional Facility - El Dorado, KS

Correctional Facilities

El Dorado Correctional Facility - El Dorado, KS
The facility lacked the funds to complete needed upgrades, so they turned to the Kansas Facility Conservation Improvement Program (FCIP) for help. All work needed to be completed within the challenging security environment
of a correctional facility. More »

- back to top -

   
 


       
           
           

Contact Us   |   Careers    |    follow us on Twitter  |    Visit us on Face Book  |  Privacy |      copyright © 2010    ConEdison Solutions